OR 213 (HWY 160) over Garrett Creek

034 MI N CLACK MARION LN · County 005, Oregon · Built 1953 · 2 Lanes · 5,449 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
03043A160 02080
Year Built
1953
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
5,449
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$288,000
Total Project Cost
$461,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.