C-1128 PINE TOWN over SAG CR (PINE TOWN ROAD)

3.15 MI E JCT ORE 86 · County 001, Oregon · Built 1981 · 2 Lanes · 403 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
02933AB28 00315
Year Built
1981
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
403
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.