HWY 061 over Willamette River

FREMONT BRIDGE · County 051, Oregon · Built 1973 · 8 Lanes · 103,251 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
02529 061 00332
Year Built
1973
Length
656.5 m (2153.9 ft)
Max Span
382.5 m
Width
45.7 m (149.9 ft)
Lanes
8
Daily Traffic
103,251
Material
Steel Continuous
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$32,056,000
Total Project Cost
$51,289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.