OR 99E (HWY 58) over Cox Creek

IN ALBANY · County 043, Oregon · Built 1940 · 4 Lanes · 29,551 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
02515A058 00069
Year Built
1940
Reconstructed
1964
Length
30.9 m (101.4 ft)
Max Span
17.3 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
29,551
Material
Concrete Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$325,000
Total Project Cost
$520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.