OR 19 (HWY 005) over MULE SHOE CREEK

0.5 MI E JCT ST HWY 390 · County 069, Oregon · Built 1939 · 2 Lanes · 406 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
02235 005 07903
Year Built
1939
Length
18.3 m (60 ft)
Max Span
11.6 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
406
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.