FRONTAGE RD HWY 02 over GURKIN CANYON CREEK
IN RUFUS · County 055, Oregon · Built 1933 · 2 Lanes · 2,663 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
45.695731, -120.734231
This bridge is in worse condition than 85.4% of bridges in County 055. The average bridge in Oregon is 0 years old; this one is 93 years old.
Nearby Bridges
E. 2nd Street over GURKIN CANYON CREEK
Built 1920
I-84 (HWY 002) EB over SCOTT CANYON EAST
Built 1965
I-84 (HWY 002) WB over SCOTT CANYON WEST
Built 1965
I-84 (HWY 002) WB over RUFUS CONN
Built 1965
I-84 (HWY 002) EB over RUFUS CONN
Built 1965
I-84 (HWY 002) WB over UPRR
Built 1965
I-84 (HWY 002) EB over UPRR
Built 1965
I-84 (HWY 002) over HELMS CREEK
Built 1964
US 97 (HWY 042) over SPANISH HOLLOW CREEK
Built 1963
US 97 (HWY 042) over SPANISH HOLLOW CREEK
Built 1963
Bridge Details
- Structure #
- 01833 002 10971
- Year Built
- 1933
- Length
- 14.3 m (46.9 ft)
- Max Span
- 11.6 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 2,663
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $150,000
- Total Project Cost
- $241,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.