US101(HWY009) over COOS BAY (MCCULLOUGH BR)

01.4 MI N HWY 240 JCT · County 011, Oregon · Built 1936 · 2 Lanes · 19,023 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01823B009 23433
Year Built
1936
Reconstructed
1967
Length
489.3 m (1605.3 ft)
Max Span
82.3 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
19,023
Material
Concrete Continuous
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,987,000
Total Project Cost
$27,179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.