MYRTLE STREET over POWDER RIVER

000 CITY OF BAKER · County 001, Oregon · Built 1987 · 2 Lanes · 1,777 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016843000000009
Year Built
1987
Length
20.7 m (67.9 ft)
Max Span
20.4 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
1,777
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.