US 730 (HWY 2) over COLD SPRINGS JUNCTION

9.8 MI W WASHINGTON ST LN · County 059, Oregon · Built 1954 · 2 Lanes · 3,403 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
01637A002 19346
Year Built
1954
Length
20.7 m (67.9 ft)
Max Span
7 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
3,403
Material
Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$218,000
Total Project Cost
$348,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.