OR 99E(HWY 001E) over CLACKAMAS RIVER

1.4 MI N OREGON CITY CC · County 005, Oregon · Built 1933 · 4 Lanes · 33,434 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01617 01E 01120
Year Built
1933
Length
222.6 m (730.3 ft)
Max Span
73.8 m
Width
18.4 m (60.4 ft)
Lanes
4
Daily Traffic
33,434
Material
Steel
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,338,000
Total Project Cost
$3,740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.