MCDOWELL CR DRIVE over SOUTH SANTIAM RIVER

4.0 MI NO SWEETHOME · County 043, Oregon · Built 1959 · 2 Lanes · 618 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01509A072900004
Year Built
1959
Reconstructed
1970
Length
109.4 m (358.9 ft)
Max Span
47.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
618
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.