US101 (Hwy 9) over Necanicum River

022 MI S SEASIDE S C LMTS · County 007, Oregon · Built 1930 · 2 Lanes · 14,464 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01481 009 02410
Year Built
1930
Length
52.4 m (171.9 ft)
Max Span
20.7 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
14,464
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$551,000
Total Project Cost
$881,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.