OR 53 (HWY 46) over Mohler Oflow

01.0 MI NE JCT HWY 53 101 · County 057, Oregon · Built 1980 · 2 Lanes · 1,592 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
01371A046 01791
Year Built
1980
Length
70.4 m (231 ft)
Max Span
15.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,592
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.