OR 99 (HWY 060) over FOOTS CREEK
05.9 E JACK.-JOSE. CO LN · County 029, Oregon · Built 1928 · 2 Lanes · 2,246 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.404989, -123.139911
This bridge is in worse condition than 45.4% of bridges in County 029. The average bridge in Oregon is 0 years old; this one is 98 years old.
Nearby Bridges
OR 99 (HWY 060) over BIRDSEYE CREEK
Built 2024
OR 99 (HWY 060) over MILLERS GULCH
Built 2024
I-5 (HWY 001) SB over ROGUE RIVER (HOMESTEAD)
Built 1961
I-5 (HWY 001) NB over ROGUE RIVER (HOMESTEAD)
Built 1961
RT FRK FOOTS CR RD over RT FRK FOOTS CREEK
Built 2003
CLASSICK DR over WARD CREEK
Built 1984
I-5 (HWY 001) over WARD CREEK
Built 1962
MAIN ST over MAIN STREET @ WARDS CR.
Built 1953
DEPOT STREET over ROGUE RIVER
Built 2006
I-5 (HWY 001) over DEPOT ST
Built 1961
Bridge Details
- Structure #
- 01349 060 01136
- Year Built
- 1928
- Length
- 23.2 m (76.1 ft)
- Max Span
- 13.7 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,246
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.