US 20 (HWY 33) over Marys River

017 MI W OF PHILOMATH · County 003, Oregon · Built 1954 · 2 Lanes · 12,164 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01075A033 04888
Year Built
1954
Length
51.8 m (169.9 ft)
Max Span
20.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
12,164
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$544,000
Total Project Cost
$871,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.