OR 229 (HWY 181) over Siletz River
028 MI N SILETZ · County 041, Oregon · Built 1946 · 2 Lanes · 680 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
44.764236, -123.914614
This bridge is in worse condition than 84.2% of bridges in County 041. The average bridge in Oregon is 0 years old; this one is 80 years old.
Nearby Bridges
OR 229 (HWY 181) over Euchre Creek
Built 1989
OR 229 (HWY 181) over Siletz River
Built 1956
OR 229 (HWY 181) over Cedar Creek
Built 1989
OR 229 (HWY 181) over Siletz River
Built 1956
CAMP 12 LOOP over MILL CREEK
Built 1975
HAMER RD over SAMS CREEK
Built 1972
SAMS CREEK RD over SILETZ RIVER
Built 1961
OR 229 (HWY 181) over Root Creek
Built 1989
SAMS CREEK RD over SAMS CREEK
Built 1960
OR 229 (HWY 181) over Davis (Skalada) Creek
Built 1997
Bridge Details
- Structure #
- 00852A181 02066
- Year Built
- 1946
- Length
- 90.1 m (295.6 ft)
- Max Span
- 58 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 680
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $946,000
- Total Project Cost
- $1,514,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.