OR 62 (HWY 022) over REESE CREEK

04.5 N EAGLE POINT NCL · County 029, Oregon · Built 1921 · 2 Lanes · 8,367 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00682A022 01462
Year Built
1921
Reconstructed
1963
Length
18.3 m (60 ft)
Max Span
9.1 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
8,367
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.