OR 22 (Hwy 32) over South Yamhill River

064 MI NW VALLEY JCT · County 071, Oregon · Built 1929 · 2 Lanes · 2,224 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00612 032 01857
Year Built
1929
Length
31.1 m (102 ft)
Max Span
15.5 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
2,224
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$327,000
Total Project Cost
$523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.