US 395 (HWY 054) over USRS CANAL
2.3 MI. N. JCT. I-84 · County 059, Oregon · Built 1989 · 5 Lanes · 7,790 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
45.786567, -119.218811
This bridge is in worse condition than 76.3% of bridges in County 059. The average bridge in Oregon is 0 years old; this one is 37 years old.
Nearby Bridges
US 395 (HWY 054) over STAGE GULCH
Built 1989
DUNNE STREET over STAGE GULCH DITCH
Built 1987
N. SHERMAN STREET over STAGE GULCH DITCH
Built 1997
HOOSIER ROAD over STAGE GULCH DITCH
Built 1987
SEYMORE STREET over UMATILLA RIVER
Built 1986
S. EDWARDS ROAD over U.S.R.S. CANAL
Built 1984
S. EDWARDS ROAD over STAGE GULCH DITCH
Built 2013
NORTH ASH ROAD over STAGE GULCH DITCH
Built 1986
STAGE GULCH ROAD over US FEED CANAL
Built 2005
US 395 (HWY 054) over USRS FEED CANAL
Built 1989
Bridge Details
- Structure #
- 00479B054 01060
- Year Built
- 1989
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14.6 m
- Width
- 29.3 m (96.1 ft)
- Lanes
- 5
- Daily Traffic
- 7,790
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $157,000
- Total Project Cost
- $251,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.