Hwy 92 over Goble Creek

5.0 MI E RANIER · County 009, Oregon · Built 1960 · 2 Lanes · 8,794 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

46.019708, -122.877372

This bridge is in worse condition than 71.1% of bridges in County 009. The average bridge in Oregon is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
00191A02W 04074
Year Built
1960
Length
36.6 m (120.1 ft)
Max Span
9.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
8,794
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.