03 S 06 W 13.00: over Cedar Creek

7.16 mi on NW Nestucca Ac · County 057, Oregon · Built 2021 · 2 Lanes · 100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
0000000L2132983
Year Built
2021
Length
6.2 m (20.3 ft)
Max Span
6.2 m
Lanes
2
Daily Traffic
100
Material
Steel
Design
Culvert
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.