11 S 04 E 16.04: over CANAL CREEK

24.6 miles NE of Hwy 20 ( · County 043, Oregon · Built 1998 · 1 Lanes · 15 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439325
Year Built
1998
Length
35.1 m (115.2 ft)
Max Span
33.5 m
Width
5.1 m (16.7 ft)
Lanes
1
Daily Traffic
15
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.