24 S 07 W 05.00: over MCGEE CREEK

4.2 miles W of Hwy 138 (M · County 019, Oregon · Built 1975 · 1 Lanes · 5 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439272
Year Built
1975
Length
13.4 m (44 ft)
Max Span
12.8 m
Width
4.8 m (15.7 ft)
Lanes
1
Daily Traffic
5
Material
Prestressed Concrete
Design
Slab
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.