24 S 04 W 23.00: over MILL CREEK

6.3 miles NE of I-5 (Exit · County 019, Oregon · Built 1988 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439271
Year Built
1988
Length
19.8 m (65 ft)
Max Span
18.9 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Slab
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.