22 S 07 W 14.01: over BRUSH CREEK

3.5 miles S of Hwy 38 (MP · County 019, Oregon · Built 1968 · 1 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439265
Year Built
1968
Length
30.5 m (100.1 ft)
Max Span
19.5 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
25
Material
Concrete Continuous
Design
Tee Beam
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.