33 S 07 W 02.00: over RIFFLE CREEK

15.8 miles NW of I-5 (exi · County 019, Oregon · Built 1966 · 2 Lanes · 250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439173
Year Built
1966
Length
40.5 m (132.9 ft)
Max Span
25.9 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
250
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.