23 S 03 W 03.01: over BIG RIVER

13.4 miles S of I-5 (Exit · County 039, Oregon · Built 1972 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439132
Year Built
1972
Length
27.4 m (89.9 ft)
Max Span
27.1 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.