18 S 08 W 28.00: over WHITTAKER CREEK

0.7 miles W of Siuslaw Ri · County 039, Oregon · Built 1961 · 1 Lanes · 20 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439108
Year Built
1961
Length
18.3 m (60 ft)
Max Span
12.2 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
20
Material
Concrete Continuous
Design
Tee Beam
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$12,000
Total Project Cost
$19,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.