27 S 10 W 06.02: over ALDER CREEK

4 miles SE of Fairview O · County 011, Oregon · Built 1960 · 1 Lanes · 20 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0000000L1439081
Year Built
1960
Length
18.3 m (60 ft)
Max Span
12.2 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
20
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$29,000
Total Project Cost
$48,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.