31 S 12 W 03.00: over SOUTH FORK COQUILLE RIVE

15.5 miles S of Hwy 42 (M · County 011, Oregon · Built 1961 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0000000L1439030
Year Built
1961
Length
71.6 m (234.9 ft)
Max Span
22.9 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
50
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$27,000
Total Project Cost
$45,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.