IRR BIA RTE 2 over SHITIKE CREEK
AT JCT BIA 2002 AND BIA 2 · County 031, Oregon · Built 1998 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
44.748967, -121.638264
This bridge is in worse condition than 21.3% of bridges in County 031. The average bridge in Oregon is 0 years old; this one is 28 years old.
Bridge Details
- Structure #
- 00000000000P946
- Year Built
- 1998
- Length
- 21.8 m (71.5 ft)
- Max Span
- 21 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.