IRR BIA RTE 2 over BADGER CREEK

30 KM NW OF WARM SPRINGS · County 065, Oregon · Built 1999 · 1 Lanes · 10 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
00000000000P907
Year Built
1999
Length
16 m (52.5 ft)
Max Span
14.7 m
Width
3.6 m (11.8 ft)
Lanes
1
Daily Traffic
10
Material
Prestressed Concrete
Design
Slab
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$49,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.