E0480 over TURKEY CREEK

6.4 W OF U.S. 81 CN 166 · County 047, Oklahoma · Built 2023 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

36.318333, -98.001111

This bridge is in worse condition than 32.3% of bridges in County 047. The average bridge in Oklahoma is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
328690000000000
Year Built
2023
Length
50.1 m (164.4 ft)
Max Span
24.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.