KICKAPOO TP NB over N DEER CREEK
1.9N I-40 .4E LUTHER RD · County 109, Oklahoma · Built 2021 · 2 Lanes · 10,354 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
35.412222, -97.202222
This bridge is in worse condition than 42.9% of bridges in County 109. The average bridge in Oklahoma is 0 years old; this one is 5 years old.
Nearby Bridges
KICKAPOO TP SB over N DEER CREEK
Built 2019
KICKAPOO TP SB over SE 59TH ST UNDER
Built 2019
KICKAPOO TP NB over SE 59TH ST UNDER
Built 2020
S LUTHER RD. over N. DEER CREEK
Built 2000
SE 44TH ST over KICKAPOO TP UNDER
Built 2019
IRR E1100 (SE 44TH over DEER CREEK TRIB
Built 2021
S PEEBLY RD over CREEK
Built 1984
E1100 (SE 44TH) over CREEK
Built 2020
KICKAPOO TP over UNNAMED CREEK
Built 2019
KICKAPOO TP SB over LUTHER RD UNDER
Built 2020
Bridge Details
- Structure #
- 324410000000000
- Year Built
- 2021
- Length
- 110.2 m (361.5 ft)
- Max Span
- 36.6 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 10,354
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.