IRR N2560 over COBB CREEK
1E .1N of SH9 · County 015, Oklahoma · Built 2022 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
35.119556, -98.424847
This bridge is in worse condition than 26.5% of bridges in County 015. The average bridge in Oklahoma is 0 years old; this one is 4 years old.
Nearby Bridges
E1300 over COBB CREEK
Built 2004
IRR E1320 over COBB CREEK
Built 2009
S.H. 146 over COBB CREEK
Built 1974
IRR 0838C over CREEK
Built 1964
IRR E1325 over COBB CREEK
Built 1960
IRR E1300 over CREEK
Built 2012
0870C over COBB CREEK
Built 1960
S.H. 9 over WASHITA RIVER OFLOW
Built 1985
S.H. 9 over WASHITA RIVER
Built 1985
S.H. 9 over CREEK
Built 1931
Bridge Details
- Structure #
- 323070000000000
- Year Built
- 2022
- Length
- 32.5 m (106.6 ft)
- Max Span
- 32 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.