E0724 over CREEK
.4S OF 131ST ON MINGO · County 143, Oklahoma · Built 2016 · 2 Lanes · 1,551 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.966769, -95.867608
This bridge is in worse condition than 43.2% of bridges in County 143. The average bridge in Oklahoma is 0 years old; this one is 10 years old.
Nearby Bridges
E0727 over CREEK
Built 2015
N4010 (MINGO RD) over FRY DRAINAGE
Built 2015
E0720 (131ST S.) over CREEK
Built 2015
N4010 (MINGO RD) over CREEK
Built 2016
E0720 (131 ST. S) over CREEK
Built 2015
FAU 8100(131ST S over CREEK
Built 1940
FAU 8100(131ST S. over HAIKEY CREEK
Built 1997
E0720 (131ST ST S) over HAIKEY CREEK
Built 2015
FAU8421(MINGO RD.S over FRY DRAINAGE
Built 1971
E0720 over WHITE CHURCH CREEK
Built 2023
Bridge Details
- Structure #
- 316690000000000
- Year Built
- 2016
- Length
- 13.9 m (45.6 ft)
- Max Span
- 4.4 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,551
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.