IRR E0760 over OTTER CREEK

11.1E 5N OF SH33/US270 · County 011, Oklahoma · Built 2017 · 2 Lanes · 30 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
316570000000000
Year Built
2017
Length
12.3 m (40.4 ft)
Max Span
4 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
30
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.