N4585 KENWOOD over DRY CREEK
12 NW OF COLCORD · County 041, Oklahoma · Built 2015 · 2 Lanes · 384 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 4 | Poor |
Location
36.317222, -94.836111
This bridge is in worse condition than 85.7% of bridges in County 041. The average bridge in Oklahoma is 0 years old; this one is 11 years old.
Nearby Bridges
D4610 over CREEK
Built 1939
IRR E0473 KENWOOD over CREEK
Built 2015
U.S. 59 over SPAVINAW CREEK
Built 2024
E0496 over BULL HOLLOW CREEK
Built 1986
D0457 over SALINE CREEK
Built 2009
IRR N4601 (2134C) over BRUSH CREEK; LAKE EUCHA
Built 1991
D4610 over CREEK
Built 1939
2132C over CREEK
Built 1939
2132C over CREEK
Built 1939
IRR E0485 KENWOOD over SALINE CREEK
Built 2015
Bridge Details
- Structure #
- 316500000000000
- Year Built
- 2015
- Length
- 37.2 m (122 ft)
- Max Span
- 18.3 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 384
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.