IRR E0920 over QUARTER MASTER CREEK

3N 3.2E OF SH33/SH34 · County 039, Oklahoma · Built 2018 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
316180000000000
Year Built
2018
Length
32.6 m (107 ft)
Max Span
31.4 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.