N3957 (MUSKOGEE) over OKMULGEE CREEK

4 BLKS N of 6 ST · County 111, Oklahoma · Built 2018 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
314600000000000
Year Built
2018
Length
27.5 m (90.2 ft)
Max Span
25.9 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.