U.S. 62 over BOLEY CREEK
1.7 MI. E OF BOLEY · County 107, Oklahoma · Built 2019 · 2 Lanes · 1,326 vehicles/day
Overall
Deck
7
Good
Superstructure
9
Excellent
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 9 | Excellent |
| Substructure | 8 | Very Good |
Location
35.4863, -96.459586
This bridge is in worse condition than 25.4% of bridges in County 107. The average bridge in Oklahoma is 0 years old; this one is 7 years old.
Nearby Bridges
Bridge Details
- Structure #
- 311550000000000
- Year Built
- 2019
- Length
- 59.6 m (195.5 ft)
- Max Span
- 25.9 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,326
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.