E0180 over CHIKASKIA RIVER OFLOW

2.8E OF S.H. 177 · County 071, Oklahoma · Built 2017 · 2 Lanes · 2,886 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Failed
Deck
0
Failed
Superstructure
0
Failed
Substructure
0
Failed

Condition Ratings

ComponentRatingDescription
Deck 0 Failed
Superstructure 0 Failed
Substructure 0 Failed

Location

36.753333, -97.230278

This bridge is in worse condition than 98.6% of bridges in County 071. The average bridge in Oklahoma is 0 years old; this one is 9 years old.

Nearby Bridges

Bridge Details

Structure #
309720000000000
Year Built
2017
Length
51.8 m (169.9 ft)
Max Span
25.9 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,886
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A