IRR E1260 over SPRING CREEK

4.8E OF GRACEMONT · County 015, Oklahoma · Built 2011 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

35.189167, -98.176389

This bridge is in worse condition than 26.5% of bridges in County 015. The average bridge in Oklahoma is 0 years old; this one is 15 years old.

Nearby Bridges

Bridge Details

Structure #
293110000000000
Year Built
2011
Length
31.4 m (103 ft)
Max Span
30.5 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$333,000
Total Project Cost
$555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.