4062C over MORRIS CREEK

2.6N OF HEAVENER · County 079, Oklahoma · Built 2010 · 2 Lanes · 250 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 8 Very Good

Location

34.926389, -94.593333

This bridge is in worse condition than 44.3% of bridges in County 079. The average bridge in Oklahoma is 0 years old; this one is 16 years old.

Nearby Bridges

Bridge Details

Structure #
291570000000000
Year Built
2010
Length
39.8 m (130.6 ft)
Max Span
15.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
250
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$333,000
Total Project Cost
$555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.