E0980 over BEAVER CREEK

.6E 1.2N OF ARAPAHO · County 039, Oklahoma · Built 2008 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
290470000000000
Year Built
2008
Length
12.2 m (40 ft)
Max Span
11.9 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
25
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$130,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.