4012C over CREEK
3E OF SPIRO · County 079, Oklahoma · Built 2014 · 2 Lanes · 100 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
35.241131, -94.566539
This bridge is in worse condition than 77.2% of bridges in County 079. The average bridge in Oklahoma is 0 years old; this one is 12 years old.
Nearby Bridges
S.H. 9 A over POTEAU RIVER
Built 1980
N4770 over CREEK
Built 2012
U.S. 271 over SPIRO LAKE OVERFLOW
Built 1952
N4770 over CREEK
Built 2002
4010C over POTEAU RIVER
Built 1997
U.S. 271 EB over POTEAU RIVER
Built 2010
U.S. 271 WB over POTEAU RIVER
Built 2010
E1270 over CREEK
Built 1995
E1220 over CREEK
Built 1983
4017C over CREEK
Built 1937
Bridge Details
- Structure #
- 288690000000000
- Year Built
- 2014
- Length
- 9.4 m (30.8 ft)
- Max Span
- 4.4 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.