S.H. 51 E.B. over STILLWATER CREEK

2.9 W. JCT U.S. 177 · County 119, Oklahoma · Built 2007 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
288440000000000
Year Built
2007
Length
91.6 m (300.5 ft)
Max Span
31.1 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,976,000
Total Project Cost
$5,533,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.