U.S. 77 NB RMP S-W over I-35 SB UNDER

6.5N OK CO C/L · County 083, Oklahoma · Built 2005 · 1 Lanes · 6,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
280160000000000
Year Built
2005
Length
93 m (305.1 ft)
Max Span
38.1 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
6,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,595,000
Total Project Cost
$4,465,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.