N2995 over EAST WINTER CREEK

5.2E 1.4S OF JT US62/SH39 · County 051, Oklahoma · Built 2005 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 8 Very Good
Substructure 8 Very Good

Location

35.024806, -97.732375

This bridge is in worse condition than 35.1% of bridges in County 051. The average bridge in Oklahoma is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
279340000000000
Year Built
2005
Length
41.9 m (137.5 ft)
Max Span
16.8 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$508,000
Total Project Cost
$813,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.