E1110 over N. CANADIAN RIVER TRIB.
2 S & .3 E OF CENTER VIEW · County 125, Oklahoma · Built 2007 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
35.404919, -96.6644
This bridge is in worse condition than 34.1% of bridges in County 125. The average bridge in Oklahoma is 0 years old; this one is 19 years old.
Nearby Bridges
EW1100 over N. CANADIAN TRIB.
Built 2007
E1110 over OVER SHAN CREEK
Built 2007
S.H. 99 NB over SHAN CREEK
Built 2009
S.H. 99 SB over SHAN CREEK
Built 1990
S.H. 99 NB over SHAN CREEK
Built 2009
S.H. 99 SB over SHAN CREEK / N. CAN. OF
Built 1990
S.H. 99 over N. CANADIAN RIVER
Built 1990
S.H. 99 over N. CANADIAN RIVER OFLOW
Built 1990
S.H. 99 over N. CANADIAN RIVER
Built 2009
S.H. 99 over N. CANADIAN RIVER OFLOW
Built 2009
Bridge Details
- Structure #
- 276400000000000
- Year Built
- 2007
- Length
- 19.1 m (62.7 ft)
- Max Span
- 18.3 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $400,000
- Total Project Cost
- $1,120,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.